Home / Naija Gist / Metro life / The Newly Constructed Tunnel In Owerri Flooded (Pics)
newly built

The Newly Constructed Tunnel In Owerri Flooded (Pics)

This is the newly Constructed tunnel at Concord Hotel Junction in Owerri Imo state, this project is less than 4 months old. The upper part of the tunnel is blocked because no car can drive at the top to avoid collapse.
If you live in Owerri or you pass through Owerri, you will understand what am talking about.

About Lolade

VI

Viral Video

Support Ooduarere

SUPPORT OODUARERE
Scan QR code below to Donate Bitcoin to Ooduarere
Bitcoin address:
1FN2hvx5tGG7PisyzzDoypdX37TeWa9uwb
x

Check Also

HWASONG-17

🇰🇵 Meet the HWASONG-17!

The world’s largest road-mobile ICBM. “Built by a sanctioned nation — no imports, no exports, no technology transfer. They built me anyway. I can be used anytime if necessary.” 26 meters tall, transported on a 22-wheel launcher, range exceeding 15,000 km, it is capable of reaching every city in the United States. Carries multiple independently targetable warheads that separate mid-flight to strike different cities simultaneously. In its 2022 test it flew for 67 minutes, reaching an altitude of 6,000 km, ...